CNPC Fracturing Water Supply System  Construction and Deep Coalbed Methane Development Project

2025-05-21
 Latest company case about CNPC Fracturing Water Supply System  Construction and Deep Coalbed Methane Development Project

Project Time: May 2022

Project Name: CNPC Coalbed Methane Co., Ltd., Fracturing Water Supply System  Construction and Deep Coalbed Methane Development Project in Deep Coalbed Methane Pilot Experimental Zone of Daji 7-5 Well Area of Daji Coalbed Methane Field (2023)

Specification and Quantity: DN150-6.4MPa, length: 500Km;

Transmission Medium and Temperature: fracturing water supply and backflow fluid, temperature 5 ℃~70 ℃. 

Working Environment: Mountainous area, with large natural slope gradient, complex terrain, and overlapping mountain and flood gullies.

latest company case about CNPC Fracturing Water Supply System  Construction and Deep Coalbed Methane Development Project  0

latest company case about CNPC Fracturing Water Supply System  Construction and Deep Coalbed Methane Development Project  1

latest company case about CNPC Fracturing Water Supply System  Construction and Deep Coalbed Methane Development Project  2